Saturday, April 14, 2012

TUSTIN AVENUE/ROSE DRIVE OVERCROSSING PROJECT

The Orange County Transportation Authority (OCTA) will construct a vehicle overpass at the intersection of Tustin Avenue / Rose Drive (Tustin/Rose) and Orangethorpe Avenue, along the Burlington Northern Santa Fe railroad track. Approximately 2,100 feet of Tustin/Rose will be elevated and realigned to pass over Orangethorpe Avenue and the railroad tracks. Orangethorpe will be widened and restriped to accommodate turning lanes needed to connect to the access road, which will rise
to meet the elevated Tustin/Rose roadway. The intersection will remain open (with very limited closures) using a detour road during a substantial period of the construction phase. When completed, the project will allow cars to safely cross over the railroad tracks, and train horns will no longer be needed at this rail
crossing.

For More Information Click Here:
http://www.octa.net/uploadedFiles/OC_Bridges/Tustin_Rose/TustinRoseFlyer.pdf

About This Blog

Short Sales and Foreclosures

More Information

  © Blogger templates Psi by Ourblogtemplates.com 2008

Back to TOP